Thursday, December 17, 2009

Pink Cervical Mucus Early Pregnancy



Hello,

the time we fight our way back violently by the paper. The first bills are scanned, the funding is final, the plans are revised and sent back and so on. The first things for the house we have bought already, four beautiful outdoor lights with motion detectors. Every day there is something

New. The day before yesterday was the third loan of Ing-Diba. Yesterday announced the architectural firm of Jacobi, that the furniture plans are in the mail. Unfortunately, it is with the documents for the planning application this year, nothing more. Then we, the community has assigned the number.

And today came the mortgage documents by the notary to order. The previous bills now amount to € 3910.71. And there comes to a lot. If the complete documents for the planning application are done, I hang the final plans back in here.

MOVING FORWARD.

Sunday, November 8, 2009

Harry Potter - Gryffindor Scar Toronto



After it was now more peaceful here it is again time for us to contact you. We

have received our preliminary moves on 2/11/2009. As we have a nice idea the layout of the Aveo model house in Frankenberg found in a medley of magic 400. Lord Hoffmann of finger house told us then telephone that the plan change will cost about 6000 €. Uppss, we were naturally surprised. Since we could not quite understand, we asked for sending a Mehr-/Minderkostenrechnung. Well, and it took a little bit.

Here are the preliminary moves, ie, the Aveo plan in the medley 400:

ground floor

From We pick up with fingers house a medley



attic

From We pick up with fingers house a medley


area plan:

From We pick up with fingers House a medley



Fortunately, Ms. Ebeling reported by Finger house, which is responsible for the mortgage lending issues and always have the accurate picture. She could put everything back on track and we had a meeting yesterday in Dölzig with our vendor, Mr tanner. Together they could take us back some concerns and answer a variety of pent-up questions.
Mr. tanner could provide us with the Mehr-/Minderkostenrechnung already. The additional costs amount to just over 6,500 euros. The costs were mainly due to the new static and an additional roof windows in the "children's". Mmhhh, the only question now was whether the changes are really worth the money. The layout of the medley is 400, too good. I would like to see the floor plan like to live once. Since I will ask Hern sunbed again that was built around a medley of 400 with the "normal" layout.
Mrs. Ebeling was able to us a detailed financial statement passed. I had gotten myself lost quite a bit and do not mind that the cost of geothermal, solar and ventilation in the cost of interior construction already in there.
Ah and the thing with the BUL has also been clarified. Since the interior work done by the company Schlausch from Gera (http://www.schlausch.com/) and obtained by finger house only the house as a development house is, the development house for the BUL 107 and the interior is offered in the BUL 809 . Well, we have to keep a capable vendor caught us and was able to pass on a discount at a tile center nearby. But I showed him our finger-house forum and our blog.

We are in the evening sat down and filed a little on the plan and found an alternative for us. Scanned and emailed or equal to Mr. Jacobi, Mr. and Mrs. Ebeling sunbed. Mr. Jacobi, I call you on Monday yet again. There is determined a need for clarification. This morning Anne was then a still that we need for the stairs is a small window because it was always dark there.


So here's the next draft of our floor plan: ground floor

:

From We pick up with fingers house a medley


Attic:

From We pick up with fingers house a medley


The water association has also been reported. Since it is our property to a property for a duplex, so are all the media twice, so we have to take another request for the separation of a water connection. This is of course again free of charge.

On Monday we have to do then with the land registry a bit of pressure, finally, after signing the purchase agreement for the land run and nothing more. The purchase price is even not yet gone to the seller, but I would have now like in the bag.

So, everything I can think for the moment not occur. It's going back!

Wednesday, October 14, 2009

Hdloader Ps2 Descargar



Yesterday I When it is going through the documents have noticed that I signed when signing the contract for work to receive a construction and service description 107, handed to me, however, a 809, which really is a small difference already.
stood in the contract confirmation also the calculated price for the medley with 1.60 meter L-shaped, although we had been resolved in the planning meeting that we are not this House want to build were, of course, some questions that I our building supervisor, Mr. Hofmann would have been happy.
He was yesterday by telephone from a consultant can not be achieved, unfortunately, I left the nice lady on the phone my questions and asked to recall today.

Too bad he has not called back, unfortunately.

But today came from the Water Board Post that "have issued from wastewater technical perspective, taking into account their notes, support for the building project" us. As an indication they explained that in the area of the property just a waste water network is available, the connection of the property to the public sewage network is possible and the rain water must be left on the property.

point I kind of funny to me before; as I leave the rain the next few years on the property. Maybe I admit even the neighbors like this somewhat.

Monday, October 12, 2009

Calories Of Sugar Cookie



We have received today by registered mail, the contract confirmation. We are number 9794, the work contract we have signed on 13.09.2009, estimated control date is 10.06.2009. It would be better of course if the been 2 months would be in advance, then we could celebrate the start of school our youngest already in the new home.

Monday, October 5, 2009

Cover Letter Online Signature



Applications to the drinking water suppliers and wastewater association are out. The drinking water supplier wants to see properly for the request of the fire water coal. According to the workshop would have to master the statement that there are sufficient nearby top-floor and underground hydrants, however, so that an official (and paid) request is not necessary. Na visit.

In recent days I have looked a little deeper into the garage. A first offer for a double garage of prefabricated from Hundhausen "Solid-type Eisenach" L / B / H: 6,00 x2, 99x2, 50 was including transportation, installation, all the delusions inside and outside clearly under the expected of me price. And the 5-year warranty. Mmhh. Also not easy. I had expected much more expensive.
Actually I was agree with Anne that we have the garage with the help of our friends even . Build I have to let me by now count only once. From the dimensions I wanted: L / W / H: 11,00 x6, 00x2, 50 Since we are building it in plate, I would like the back of the garage build a workbench and perhaps bring our bikes. In addition, a small sink, so clean water mains and sewage back out. Power cable pull over yet ... So many ideas, see what is the bottom line for a price. Visually of course, a large (wide) garage door would be nice, but probably more useful is the version with the two single doors.

And so every day: what garage which goal which knee wall? United we are, however, that our house is a Medley of finger and is home with the floor plan we are already secure. Ultimately, the questions will probably all decided on a price. Our kitchen, we want to take on any case. Which is still fresh as a daisy and almost everything in it. So our kitchen manufacturers must then ran, tinkering, the "old kitchen" in the new plan.


Saturday, September 26, 2009

Bronze Dress What Shoes






Today we had our planning meeting with our architect, Mr. Jacobi by the engineering firm of Jacobi Großräschen. He takes orders Finger house in the east.
And I know he is reading this also, thanks for the loose and result-oriented talks. They have shown great patience with us and our special needs.
As we have already informed the finger house forum in advance, which is so needed at the planning meeting, we had been worried a lot. Development plan, sewer plan and the address by the chimney, we already had. We had to catch up: address of the competent building authority, address the congregation, address of the wastewater association, address of the drinking water supplier.

For Later there were also a few tasks:
- Wastewater Association request to which the Rain water, mixing or separation system
- Obtaining food plan and Möbelpan for sampling

He was also - statements of Trinwasserlieferanten for fire water supply
- Opinion of the wastewater association for the secure development
- Requests for sewer and drinking water get
- Land Registry for geothermal
A few notes:
- roadblocks before construction get the clerk's office
- Crane footprint must be fixed, any substructure of the garage entrance use
- having Bafa.de application for funding of the solar system to obtain

Since we are from the development plan a little different, a Bauanzeige is unfortunately not sufficient. But this is also no problem

We continue the conversation drove together to the land which he has made a few photos of the property and the driveway. All in all, it took only four hours. There were coffee (Annett would certainly also made a machine), sandwiches and a few vegetables on the side. Football and my appointment I have not done, but this was not too bad, because Anne was not really fit. I also had table tennis on Wednesday and the "Thursday women's sports group" really well enough.

Oh I almost forgot the most important thing: We will build
probably 80 percent of the 400 medley with the 1m knee wall. I have a little hope in my townhouse. The villa looks at me without expensive additional equipment such as winter garden or balcony in total harmony. As the plan we came up with the plan of the Aveo model house from Frankenberg magic in the medley. Now I'm just looking forward to the prints.

Greetings to Großräschen.

Tuesday, September 22, 2009

How Long Can A Lizard Survive In A Car



So, the first invoice has been received. The notary for the purchase of land is the first in the league.
Saturday is the first appointment with the architect. Today mail came from fingers House: Our client adviser Mr. Hoffman has been presented to us and send us a schedule. The development plan and the plan I have now the same channel in the Community-fetched. Let's see how long we need with the architect. I still want to soccer.

Thursday, September 17, 2009

Trading Between Emerald Soulsilver



We have dared.

Anne never wanted to build, I've always had the desire. So optimal conditions. So it did have a whole lot of patience and gentle persuasion, until she finally said yes. Their condition were: proximity, not in the immediate area of the basin, geothermal, low-energy house.

So I've seen a lot and gain information on the Internet. Via a website I can send me catalogs of manufactured home manufacturers. determined there were 20 kilos of felt 200 companies. Eventually, I came across finger house. Many wrote that they have with finger house very good experience, really negative experiences, I have not found. So the first company was found. Especially since the complete package unanimously on first glance seemed. The second company I had taken into account and Bien Zenker (as an alternative) a company in the immediate proximity, the company HOGAF that offer just the house of my dreams, but to build houses in massive construction.

Now it was to find the right property yet. After attending two of local real estate agent, I was visiting my bank where a notice with land deals. And there it was: grounds, Sprotta settlement, 704 sqm, € 24,640. Perfect. So appointment with the bank made, site and viewed immediately smitten.
re one step further.







reported Shortly after, a project and planning office of Meissen. Whether he could be planning our dream home? Sure he could. A bill would come only if we build our house with him. So date made, site showed the first exploratory talks. A week later the first floor plan. Great. Everything included, 140 square meters, ground floor kitchen, utility room, large living / dining area, guest bathroom, upstairs two large children's room, a bedroom with dressing, large bathroom with space for a small sauna. Unfortunately, with too small a knee wall, so that the sauna would never fit into. In addition, a window in the attic just above the bed. Nope, we did not want. Moreover, the first financial report was for the entire project. The decline in costs for the planner with a nearly 10 percent. Too much for our tight budget.

And almost every day were more calls from home builders. Also, once home of finger. I shared with every phone call that we have already awarded the contract to an architect. The nice man from fingers House said it: "That does not mean that they will build with him." The answer has left an impression. I liked really well. Not pushy, very open and very nice. I immediately made an appointment with him in a show house in Unger Park Dölzig. Mr. tanner told us in detail the company Finger house and the various services and gave us next to some beautiful prospects of the Medley-villa also material to the services heating and building work description. On the way to the car we have looked into a show house by Bien-Zenker, also nice.

the planner from Meissen had told him shortly after that we will not build with it, because its costs exceed our budget.

through a tip of a very good friend, we came to the house construction-HOGAF So GmbH Appointment made for a consultation. This time, even the children. After an hour the two were naturally anxious, so I have gone only for a walk with them and picked up the first chestnut. With Mr. Frodl from HOGAF we have had our children, despite a very pleasant interview. He could show us different types of houses in our home and had been allowed to build near many houses. But wait Concrete. The Annett did not really.

On 12 September, we were then to Bauherrentag finger at the company house in Frankenberg. Four hours of driving, has made every minute of it paid for. In addition to sampling a 500 € voucher, we were the Production facilities out and were able to admire the creation of a single house. We have several presentations by STO, Viessmann and Stiebel Eltron-attended and observed two model homes. A fulfilling day, which has affected the balance in favor of a good deal of finger house. On Sunday we have
then signed a work contract for a medley of 400 with 160 cm L-shaped. The following Tuesday we were again at the notary and have the contract signed for the land. The project was right on driving.

Let's see how it goes.