Bronze Dress What Shoes






Today we had our planning meeting with our architect, Mr. Jacobi by the engineering firm of Jacobi Großräschen. He takes orders Finger house in the east.
And I know he is reading this also, thanks for the loose and result-oriented talks. They have shown great patience with us and our special needs.
As we have already informed the finger house forum in advance, which is so needed at the planning meeting, we had been worried a lot. Development plan, sewer plan and the address by the chimney, we already had. We had to catch up: address of the competent building authority, address the congregation, address of the wastewater association, address of the drinking water supplier.

For Later there were also a few tasks:
- Wastewater Association request to which the Rain water, mixing or separation system
- Obtaining food plan and Möbelpan for sampling

He was also - statements of Trinwasserlieferanten for fire water supply
- Opinion of the wastewater association for the secure development
- Requests for sewer and drinking water get
- Land Registry for geothermal
A few notes:
- roadblocks before construction get the clerk's office
- Crane footprint must be fixed, any substructure of the garage entrance use
- having Bafa.de application for funding of the solar system to obtain

Since we are from the development plan a little different, a Bauanzeige is unfortunately not sufficient. But this is also no problem

We continue the conversation drove together to the land which he has made a few photos of the property and the driveway. All in all, it took only four hours. There were coffee (Annett would certainly also made a machine), sandwiches and a few vegetables on the side. Football and my appointment I have not done, but this was not too bad, because Anne was not really fit. I also had table tennis on Wednesday and the "Thursday women's sports group" really well enough.

Oh I almost forgot the most important thing: We will build
probably 80 percent of the 400 medley with the 1m knee wall. I have a little hope in my townhouse. The villa looks at me without expensive additional equipment such as winter garden or balcony in total harmony. As the plan we came up with the plan of the Aveo model house from Frankenberg magic in the medley. Now I'm just looking forward to the prints.

Greetings to Großräschen.