Today again with a small "Progress report Interim Report".
clock on Monday morning at 6 I was looking at the construction site to search for the blower-door test. And when I parked in front of our house, I have not surprised poor. In addition to our house was a large van with a trailer behind it. In front of the house the man was standing by the blower door test. Now I had first thought, which are perhaps the two of them and go after the test from site to site on. Ne ne ne! :-) The man of the blower-door test, introduced himself and suddenly the door opened from the trailer! This man introduced himself as well. It was the man of our walls plastered inside and grinds. I asked where the colleagues are? He answered and said he was all alone and this week the House of putty inside is completely alone and grind. Since I'm only me mhhhh, I'm curious! And what makes this week even been here? The ought to come before next week?! Mmmhh, Funny! But there was yet another problem! Quite a lot of people on site at the same time! Spachtler, blower-door test man, and the fireplace construction team! But what shall I tell you? It went really well. The upstairs Spachtler has established domestic and blower door test was performed without problems. Incidentally. The test is very good. Great job so far of FH. And just completed at the moment when the test was, the boys came from the fireplace manufacturer. The above Spachtler has started and so it was issued in bricklayers hand! The fire is already in place and will this week may already plastered! Images come in the next few days.
I just have a picture of Fireplace found in the structure:


Here is an updated picture straight from the construction:


Now the fire is so far almost done. He has now just become drier and then he will be plastered and painted fine.



And another picture of the blower-door test:


Tschö with Ö

Tuesday, January 26, 2010

Birks Challenger Watch



14.01.2010 We have been following a "signer orgy" the planning application to the District Office. Is madness. Feels 200 signatures. I had already beat the mighty Schn .... full. And all for a normal working day. The first bill by FH was of course shortly thereafter, 5 percent of the construction costs are due. As the only bank financing is not yet out of the land, the payment can wait a little.

today then came the second letter from the district administration office. The first one has told us the file number of our planning application, in today's letter informed you that a couple of missing documents. Among other things, a fourth plan solution. That is indeed again a lot of signatures. Ummppf. Much regards the Ingeniuerbüro, but we must ask, for example, nor our neighbors to agree to our building project. Germany is already really strange! and the two parcels are now well-united after all. (This costs determined again what.) But it's going.
The required insurance we can also check again independent. There we can perhaps save a few euros.

came today then even mail from FH. The amendments to the initial draft (in contract) gerademal cost 170 euros. Since we were pleased. I thought it would be more expensive. But as you can see again:




EVERYTHING GOOD!

Tuesday, January 12, 2010

Change Default Web Cam For Internet Explorer



The masses of snow that has fallen here in recent days and the many liters of sweat, which I have walked down the blades on the back is to me an old story from the Forum occurred.

http://www.chefkoch.de/forum/2, 31.270008 / The Christmas Snow history or learn-as-can-I-schneeschaufeln.html

I understand the poor guy almost.

the moment we have the required insurance companies consider the transfer of ownership of the property is received, the kitchen manufacturer tears his hair, etc. So everything is always like, or as we say aba (Insider).