Saturday, September 26, 2009

Bronze Dress What Shoes






Today we had our planning meeting with our architect, Mr. Jacobi by the engineering firm of Jacobi Großräschen. He takes orders Finger house in the east.
And I know he is reading this also, thanks for the loose and result-oriented talks. They have shown great patience with us and our special needs.
As we have already informed the finger house forum in advance, which is so needed at the planning meeting, we had been worried a lot. Development plan, sewer plan and the address by the chimney, we already had. We had to catch up: address of the competent building authority, address the congregation, address of the wastewater association, address of the drinking water supplier.

For Later there were also a few tasks:
- Wastewater Association request to which the Rain water, mixing or separation system
- Obtaining food plan and Möbelpan for sampling

He was also - statements of Trinwasserlieferanten for fire water supply
- Opinion of the wastewater association for the secure development
- Requests for sewer and drinking water get
- Land Registry for geothermal
A few notes:
- roadblocks before construction get the clerk's office
- Crane footprint must be fixed, any substructure of the garage entrance use
- having Bafa.de application for funding of the solar system to obtain

Since we are from the development plan a little different, a Bauanzeige is unfortunately not sufficient. But this is also no problem

We continue the conversation drove together to the land which he has made a few photos of the property and the driveway. All in all, it took only four hours. There were coffee (Annett would certainly also made a machine), sandwiches and a few vegetables on the side. Football and my appointment I have not done, but this was not too bad, because Anne was not really fit. I also had table tennis on Wednesday and the "Thursday women's sports group" really well enough.

Oh I almost forgot the most important thing: We will build
probably 80 percent of the 400 medley with the 1m knee wall. I have a little hope in my townhouse. The villa looks at me without expensive additional equipment such as winter garden or balcony in total harmony. As the plan we came up with the plan of the Aveo model house from Frankenberg magic in the medley. Now I'm just looking forward to the prints.

Greetings to Großräschen.

Tuesday, September 22, 2009

How Long Can A Lizard Survive In A Car



So, the first invoice has been received. The notary for the purchase of land is the first in the league.
Saturday is the first appointment with the architect. Today mail came from fingers House: Our client adviser Mr. Hoffman has been presented to us and send us a schedule. The development plan and the plan I have now the same channel in the Community-fetched. Let's see how long we need with the architect. I still want to soccer.

Thursday, September 17, 2009

Trading Between Emerald Soulsilver



We have dared.

Anne never wanted to build, I've always had the desire. So optimal conditions. So it did have a whole lot of patience and gentle persuasion, until she finally said yes. Their condition were: proximity, not in the immediate area of the basin, geothermal, low-energy house.

So I've seen a lot and gain information on the Internet. Via a website I can send me catalogs of manufactured home manufacturers. determined there were 20 kilos of felt 200 companies. Eventually, I came across finger house. Many wrote that they have with finger house very good experience, really negative experiences, I have not found. So the first company was found. Especially since the complete package unanimously on first glance seemed. The second company I had taken into account and Bien Zenker (as an alternative) a company in the immediate proximity, the company HOGAF that offer just the house of my dreams, but to build houses in massive construction.

Now it was to find the right property yet. After attending two of local real estate agent, I was visiting my bank where a notice with land deals. And there it was: grounds, Sprotta settlement, 704 sqm, € 24,640. Perfect. So appointment with the bank made, site and viewed immediately smitten.
re one step further.







reported Shortly after, a project and planning office of Meissen. Whether he could be planning our dream home? Sure he could. A bill would come only if we build our house with him. So date made, site showed the first exploratory talks. A week later the first floor plan. Great. Everything included, 140 square meters, ground floor kitchen, utility room, large living / dining area, guest bathroom, upstairs two large children's room, a bedroom with dressing, large bathroom with space for a small sauna. Unfortunately, with too small a knee wall, so that the sauna would never fit into. In addition, a window in the attic just above the bed. Nope, we did not want. Moreover, the first financial report was for the entire project. The decline in costs for the planner with a nearly 10 percent. Too much for our tight budget.

And almost every day were more calls from home builders. Also, once home of finger. I shared with every phone call that we have already awarded the contract to an architect. The nice man from fingers House said it: "That does not mean that they will build with him." The answer has left an impression. I liked really well. Not pushy, very open and very nice. I immediately made an appointment with him in a show house in Unger Park Dölzig. Mr. tanner told us in detail the company Finger house and the various services and gave us next to some beautiful prospects of the Medley-villa also material to the services heating and building work description. On the way to the car we have looked into a show house by Bien-Zenker, also nice.

the planner from Meissen had told him shortly after that we will not build with it, because its costs exceed our budget.

through a tip of a very good friend, we came to the house construction-HOGAF So GmbH Appointment made for a consultation. This time, even the children. After an hour the two were naturally anxious, so I have gone only for a walk with them and picked up the first chestnut. With Mr. Frodl from HOGAF we have had our children, despite a very pleasant interview. He could show us different types of houses in our home and had been allowed to build near many houses. But wait Concrete. The Annett did not really.

On 12 September, we were then to Bauherrentag finger at the company house in Frankenberg. Four hours of driving, has made every minute of it paid for. In addition to sampling a 500 € voucher, we were the Production facilities out and were able to admire the creation of a single house. We have several presentations by STO, Viessmann and Stiebel Eltron-attended and observed two model homes. A fulfilling day, which has affected the balance in favor of a good deal of finger house. On Sunday we have
then signed a work contract for a medley of 400 with 160 cm L-shaped. The following Tuesday we were again at the notary and have the contract signed for the land. The project was right on driving.

Let's see how it goes.